洛阳机车厂废水处理站升级改造工艺设计综述

[摘要]既有废水处理站废水处理工艺为调节隔油+气浮+砂滤池,污泥采用自然干化工艺。改造原则是充分利用既有设施,在原有工艺基础上增加CAST生化处理工艺,污泥处理改用离心机脱水工艺,既有污泥干化场改造为封闭式堆场。为降低气味对周围环境的影响,CAST池采用盖板封闭措施;为提高系统抗冲击负荷能力,反应池内填充20%立体弹性填料。

[关键词]铁路机车废水;升级改造;隔油;气浮;CAST;填料

Summary of Upgrading and Revamping Process Design of Wastewater Treatment Station in Luoyang Locomotive Works

Abstract:The existing wastewater treatment station wastewater treatment process is adjusting oil separation air flotation sand filter, and sludge is dried naturally. The transformation principle is to make full use of the existing facilities, add CAST biochemical treatment process on the basis of the original process, change sludge treatment to centrifugal dewatering process, and transform the existing sludge drying field into a closed yard. In order to reduce the influence of odor on the surrounding environment, the CAST tank was sealed by cover plate, and 20% solid elastic filler was filled in the tank to improve the impact load resistance of the system.

Keywords:railway locomotive wastewater; upgrading; oil isolation; air flotation; CAST; filler

1前言

洛阳某机车厂主要承担内燃、电力机车,检修、制造机车关键大部件和铁路工程机械整机制造等生产任务。十二五”期间,国家在巩固化学需氧量减排的基础上,将加强对氨氮以及总氮、总磷和重金属等污染物的排放控制及总量削减。水污染防治以城镇生活污水提标升级改造、高浓度、高含盐、难降解工业废水处理、废水资源化为重点,同时加强农村生活污水及河湖等领域的污染防治。洛阳机车厂属机车修理行业,由于目前公司生产品种和产量都发生了很大的变化,生产排水的状况有了很大的变化,同时废水处理站相关设施和设备运行存在严重老化和腐蚀现象,使废水的处理效果大幅降低,直接影响再生水的水质指标,为达到较高要求的出水水质,现对现有工艺进行升级改造。

2国内外同类研究概况

剩余内容已隐藏,您需要先支付 10元 才能查看该篇文章全部内容!立即支付